Request
hire

Select
Excavators
Rollers
Compactors
Bulldozers
Loaders
Dumpers
Access Equipment
Trailers
Trucks
Watercarts
Grader Tractors
Sweepers
Chippers & Splitters
Others
Attachments
Back
1.2 Ton Excavator
1.7 Ton Excavator
2.5 Ton Excavator
3.5 Ton Excavator
5 Ton Excavator
8 Ton Excavator
10 Ton Excavator
12 Ton Wheel Excavator
13 Ton Excavator - Conventional Swing
14 - 15 Ton Excavator - Short Radius
20 - 23 Ton Excavator - Conventional Swing
23 - 25 Ton Excavator - Short Radius
Back
1.5 Ton Double Smooth Drum Roller
1.6 Ton Remote Control Trench Roller
2.5 - 3 Ton Double Smooth Drum Roller
3.5 Ton Padfoot Roller
4 Ton Combi Roller
4 - 5 Ton Double Smooth Drum Roller
5 Ton Padfoot Roller
7 - 8 Ton Single Smooth Drum Roller
8 Ton Double Smooth Drum Roller
8 Ton Padfoot Roller
8 Ton PTR Roller
12 - 13 Ton Single Smooth Drum Roller
12 - 14 Ton Padfoot Roller
12 Ton PTR Roller
16 Ton Padfoot Roller
Back
58KG Trench Rammer
300KG Plate Compactor
450KG Reversible Plate Compactor
800KG Remote Control Plate Compactor
Back
7 - 8 Ton Bulldozer
9 - 10 Ton Bulldozer
13 - 15 Ton Bulldozer
20 Ton Bulldozer
Back
Cormidi C85 Self Loading Tracked Dumper
Cormidi C85 ML Mini Loader
1.6 Ton Track Loader - PT30
2.6 - 3 Ton Track Loader - PT50, T450
3 Ton Wheel Loader - 0.5m3 Bucket
3.5 - 4 Ton Track Loader
4.0 - 4.5 Ton Track Loader - Case 320, 380
5 - 6 Ton Wheel Loader - 1m3 Bucket
7 - 9 Ton Wheel Loader - 1.2m3 Bucket
10 - 12 Ton Wheel Loader - 2m3 Bucket
13 - 14 Ton Wheel Loader
Back
800KG Cormidi C85 Track Dumper - High Tip
Cormidi C85 Self Loading Tracked Dumper
1.2 Ton Track Dumper - Straight Tip
1.2 Ton Track Dumper - Swivel Tip
1.5 Ton Site Dumper - Swivel Tip
1.6 Ton Track Dumper - Swivel Tip
3 Ton Track Dumper - Swivel Tip
3 - 4 Ton Site Dumper - Swivel Tip
6 Ton Site Dumper - Swivel Tip
9 Ton Site Dumper - Swivel or Straight Tip
Morooka 10 Ton Rubber Track Dumper
Hydrema 912 - 12 Ton Articulated Dumper
Hydrema 912HM - 12 Ton Articulated Dumper
Hydrema 922 - 22 Ton 6 Wheel Articulated Dumper
Back
Electric Boom Lifts
Diesel Articulating Knuckle Boom Lifts
Diesel Telescopic Boom Lifts
Electric Slab Scissor Lifts
Rough Terrain Scissor Lifts
Mast Lifts
Back
2.5 Ton Equipment Trailer
3.5 Ton Equipment Trailer
Kubota B3150 Tractor Road Broom Trailer
Back
3 Ton Tipper Truck
5 Ton Tipper Truck
8 Ton Tipper Truck
11 Ton Tipper Truck
Back
1200L Watertank on Trailer
2500L Slip-on Watertank
3000L Watercart
5000L Slip-on Watertank
6000L Watercart
8000L Watercart
10,000L Watercart
Back
1.5 Ton Kubota Tractor Grader
3 - 4 Ton Kubota Tractor Grader
Back
Kubota B3150 Sweeper Tractor
Back
Vermeer Brush Chipper BC700XL
Vermeer Brush Chipper BC1000XL
Back
Mobile Topsoil Screener
RTV 1140 Kubota All Terrain Vehicle
Back
4 in 1 Bucket
Auger Drive Unit
Auger Equipment
Compaction Wheel
Digging and Rocket Bucket
Drum Cutter
Hydraulic Tilt Bucket
Mulcher
Multi Grab Bucket
Pallet Fork
Rock Breaker
Root Rake
Rotating Grapple
Screening Bucket
Sharp Grade Leveller
Single Tine Ripper Pick
Spade and Trench Bucket
Spreader or Leveller Bar
Sweeper Broom Attachment
Trencher Attachment
Vibro Plate Compactor
Wide Bucket
Add product

Select
Day
Week
Month
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Make an
enquiry

23-25 Ton Excavator - short radius

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Drag
19 Jun 2023

Connecting Auckland to the North: The Puhoi to Warkworth Motorway

In a significant development for transportation infrastructure, New Zealand’s highly anticipated Puhoi to Warkworth Motorway has finally opened, forging a crucial link between Auckland and the North. With a presence in both Warkworth and Auckland, our team at Pronto Hire are honoured to have played a part in the construction of this remarkable motorway. In this blog post, we will explore the five benefits of the Puhoi to Warkworth Motorway, highlighting how it strengthens the connection between these two regions and facilitates seamless travel for both locals and visitors.

1. Improved Accessibility

The Puhoi to Warkworth Motorway brings unprecedented accessibility to the previously underserved region north of Auckland. Traveling to Warkworth used to be time-consuming and congested due to limited road infrastructure. However, with the completion of this motorway the commute time has been significantly reduced, making it easier for both Aucklanders, workers who travel daily and tourists to explore the beauty and attractions of the North.

2. Reduced Travel Times

One of the key benefits of the Puhoi to Warkworth Motorway is its ability to reduce travel times between Auckland and the North. What once took over an hour during peak traffic can now be accomplished in around 30 minutes. This time-saving advantage not only enhances the convenience for residents and businesses but also encourages greater exploration of the stunning Northland region.

3. Enhanced Safety

The Puhoi to Warkworth Motorway not only offers convenience and efficiency but also significantly improves safety for road users. The old State Highway 1, which previously connected the two regions, was notorious for its narrow lanes, sharp corners, and dangerous stretches. The new motorway, built to modern design standards, features wider lanes, improved visibility, and better signage, reducing the risk of accidents and providing a safer journey for all.

4. Economic Boost

The completion of the Puhoi to Warkworth Motorway opens up new economic opportunities for both Auckland and the North. With improved connectivity, businesses in Warkworth can now easily access the larger customer base in Auckland, expanding their reach and driving growth. Similarly, Auckland-based companies can now tap into the resources, talent, and scenic beauty that the North offers. Additionally, the motorway’s construction itself has provided a significant boost to the local economy, creating jobs and stimulating investment in the region.

5. Tourism and Recreation

The Puhoi to Warkworth Motorway is a game-changer for tourism in the Northland region. Aucklanders can now embark on day trips or weekend getaways to explore the breathtaking beaches, stunning landscapes, and cultural sites the North has to offer. Visitors from overseas or other parts of New Zealand can easily access Auckland and continue their journey to the North, opening up new possibilities for tourism operators, accommodations, and recreational activities.

How the New Motorway will Impact Pronto Hire

The completion of the Puhoi to Warkworth Motorway will have a significant impact on Pronto Hire. With the motorway now seamlessly connecting Auckland and the North, our ability to efficiently send equipment to various locations has been greatly enhanced. With the motorway’s completion, our operations can become smoother, more streamlined, and time-efficient. We can now ensure prompt delivery of equipment to our customers, enabling them to commence their construction and infrastructure projects without delay. This improved accessibility has also opened up new opportunities for us to expand our services across a wider geographical area. The Puhoi to Warkworth Motorway is transforming the way we operate, allowing us to better serve our clients and contribute to the development of both Auckland and the North.

The Puhoi to Warkworth Motorway serves as a vital link between Auckland and the North, revolutionizing transportation and connectivity for residents and businesses alike. This project, in which our rental company played a significant role in creating, has not only reduced travel times and improved safety but has also stimulated economic growth and enhanced tourism opportunities in the region. As we look to the future, the Puhoi to Warkworth Motorway stands as a testament to New Zealand’s commitment to progress, connectivity, and prosperity for all.

Similar
Articles